Electrical Services

Following tests are to be carried out as per IS: 325.

  • AC hi – pot test at 2.0 kv r.m.s. for 1 minute.
  • IR test at 1.0 kv dc before and after hv test.
  • Winding resistance test.
  • Impedance test by use of 1 phase and 3 phase low voltage ac supply.
  • No load test run.(UP TO 50-HP )
  • Space heater test.
  • Vibration testing.
  • Motor checker for inductance testing.

Guarantee:

Rewound motor will be guaranteed for ‘B’ class insulation 6 months & ‘F’ class insulation 12 months from the date of dispatch against the defect of material and workmanship only.

Onsite Electricals Services

onsite-electrical
onsite-electrical
onsite-electrical
onsite-electrical
onsite-electrical
onsite-electrical
onsite-electrical